CATL Wind BESS Hybrid Project Turkey

Integration of CATL’s 15 MWh system, marking the first BESS installation in Turkey’s largest 15.2 MWm wind + BESS hybrid project.
21. November 2025 · Von PowerKonnekt
PowerKonnekt EMS has completed the integration of CATL’s 15 MWh system, marking the first BESS installation in Turkey’s largest 15.2 MWm wind + BESS hybrid project.
PowerKonnekt is the trusted EMS provider for CATL projects across Europe.
Our EMS platform connects and manages:
• CATL utility-scale battery systems
• Power Electronics PCS
• ENERCON wind turbines
The system architecture is designed with strong redundancy and a strict cybersecurity framework, enabling stable, continuous operation with zero-downtime targets.
With this integration, PowerKonnekt enables market services such as energy arbitrage, frequency regulation, and power balancing. This helps investors build more flexible and diversified revenue models.
Our monitoring dashboard provides real-time system visibility, allowing O&M teams to track battery SOH, optimize resting periods, and improve the overall efficiency and safety of the plant.
The flexibility of the PowerKonnekt EMS has already allowed the investor to plan an expansion to 21.2 MWm and 26.56 MWh in 2026.
We would like to thank Polat Enerji, the project investor, for their confidence in our EMS technology and for their constructive collaboration throughout the integration process.
Their forward-looking investment approach has been essential in bringing Türkiye’s first wind + storage hybrid project of this scale to life.