Menü

Best Tools EMS Integration in Romania

Best Tools EMS Integration in Romania

Integrating a Jinko Sungiga G1 storage system, 100 kW / 215 kWh, with PowerKonnekt EMS

4. Juni 2026 · Von PowerKonnekt


We have recently integrated a Jinko Sungiga G1 storage system, 100 kW / 215 kWh, together with EMS PowerKonnekt, in an application with 5 photovoltaic parks and backup generator with ATS.

The role of the system is simple to say, but complex to implement: locally produced energy must be used as efficiently as possible, stored when it is available and intelligently directed where it is needed.

This is where EMS comes in.

It coordinates the flows between photovoltaics, battery, consumers and generator, so that the system does not work "in pieces", but as a coherent whole.

The generator also has an important role: it ensures continuity when needed. And in this case, it also has a beautiful story: it was also supplied and installed by us, a few years ago. 😄

The real challenge was not only the installation of the equipment, but the synchronization of several production sources distributed over about 10 ha.

The result: a more flexible, stable and intelligent energy system.

For more details about the project: https://lnkd.in/d57jcMke